Yorkville 42-Unit Tower Annual Fan Coil Service Program
A documented project record from Condo HVAC Repair Toronto. A 2001 Yorkville tower with 42 McQuay vertical fan coils had a growing list of warm-suite complaints every July. The board approved an annual service contract after a free walk-through showed scaled coils, tired condensate pumps and sticking zone valves across most stacks.
By The Condo HVAC Repair Toronto Crew
Project Attributes
- Scope
- Descale 42 McQuay fan coils, replace 4 condensate pumps and 11 motorized zone valves
- Price
- $38,500 CAD
- Payment
- Annual service contract, invoiced per service night
- Lead time
- 3 weeks from board approval
- On site
- 3 service nights across 2 weeks
- Client
- Condo board (2001 tower)
- Crew
- Marcus Chen (Ops Mgr) + 4 technicians
- Equipment
- McQuay vertical fan coils, 2001 vintage
- Neighbourhood
- Yorkville
- Building
- 42 suites, 2001 construction
The Challenge
The building had never had a planned fan coil program. Repairs were reactive, one suite at a time, and the same stacks kept failing every summer. Residents on the upper floors had the worst of it, with supply air barely below room temperature on hot afternoons.
The board wanted the work done without daytime disruption, without anyone moving furniture, and with one invoice per service night that matched the approved scope.
Results
- Average supply air temperature in cooling mode dropped by roughly 4 to 6 degrees across the descaled units.
- Zero resident complaints logged with management during the three nights.
- Final invoice matched the written quote line for line.
- Program renewed as an annual service contract.
How We Ran It
- 1
Free walk-through and baseline readings
Marcus Chen walked 8 sample suites with the superintendent and logged entering and leaving water temperatures, airflow and pan condition. The readings pointed to scale in the coils rather than a building plant problem.
- 2
Written scope and suite schedule
The board received a written scope listing every suite, the work per suite and the price. Suite entry notices went out through management 10 days before the first night.
- 3
Three service nights
Two crews worked stack by stack from 6 pm to midnight. Each coil was isolated, flushed with a descaling solution, rinsed and returned to service before the crew moved on. Four failed condensate pumps and 11 sticking zone valves were swapped as found.
- 4
Close-out report
Every suite got a before and after temperature split on the report, plus a list of units that will likely need replacement within five years so the reserve fund study could account for them.
Project Photos
Click any photo to enlarge it.
"Descaled 42 McQuay fan coils across our 2001 tower over 3 service nights, zero complaints from residents. Written quote matched the final invoice."
David M., Board president, Yorkville
More Condo HVAC Projects
Mimico Mimico 180-Unit Lakefront
Building-Wide Fan Coil Replacement
- Scope
- Rolling fan coil replacement
- On site
- 14-week rolling install
- Crew
- Elena Vargas (Ops Mgr) + 2 crews
- Equipment
- Replacement vertical fan coils with ECM motors
- Neighbourhood
- Mimico
Downtown Markham Downtown Markham 24-Unit Mid-Rise
Water-Source Heat Pump Repair
- Scope
- Reversing valves + contactors
- On site
- 6 days over one season
- Crew
- James Kowalski (Ops Mgr) + 2 technicians
- Equipment
- Trane Axiom water-loop heat pumps
- Neighbourhood
- Downtown Markham
Agincourt Agincourt Low-Rise Magic-Pak
Two-Floor Magic-Pak Replacement
- Scope
- 16 units to MGE series + louvers
- On site
- 8 working days
- Crew
- David Okonkwo (Ops Mgr) + 3 technicians
- Equipment
- Magic-Pak MGE series
- Neighbourhood
- Agincourt
Planning Work Like This in Your Building?
Start with a free walk-through and readings in sample suites. Your board gets a written scope, per-unit pricing and a schedule before anyone commits.
- Written scope before work
- TSSA + Enbridge Red Tag + ESA + WSIB
- Written workmanship warranty