Downtown Markham 24-Unit Mid-Rise Heat Pump Repair
A documented project record from Condo HVAC Repair Toronto. A 24-unit Downtown Markham mid-rise had heat pumps stuck in one mode at the spring changeover and a run of contactor failures mid-season. A previous contractor had suggested chassis replacement for several units. The diagnostic showed most of them only needed valves and contactors.
By The Condo HVAC Repair Toronto Crew
Project Attributes
- Scope
- Single-season water-source heat pump repair: reversing valves and contactors
- Price
- $14,200 CAD
- Payment
- Progress invoiced, net 30
- Lead time
- 1 week
- On site
- 6 days over one season
- Client
- Property manager (24-unit mid-rise)
- Crew
- James Kowalski (Ops Mgr) + 2 technicians
- Equipment
- Trane Axiom water-loop heat pumps
- Neighbourhood
- Downtown Markham
- Building
- 24 suites, 2000s construction
The Challenge
At changeover, several suites were stuck in heating mode with the building loop already on cooling temperatures. Mid-season, three compressors stopped on the same week, each with a pitted contactor.
The property manager had a quote recommending chassis swaps that would have cost well over the annual repair budget.
Results
- No chassis replacements needed on the units originally flagged.
- All 24 suites cooling and heating correctly through the season.
- Progress invoiced on net 30 terms, within the annual repair budget.
- Building moved onto an annual service contract with the same team.
How We Ran It
- 1
Loop first, unit second
James Kowalski checked loop supply temperature, flow and strainers before touching any chassis. The loop was healthy, which put the problem squarely in the units.
- 2
Reversing valve testing
Solenoid coils were tested for voltage and resistance, then valve shift was confirmed on gauges. Valves that would not shift were replaced with refrigerant recovered and recharged by weight.
- 3
Contactor and capacitor sweep
Every unit in the building had its contactor and run capacitor checked, so the remaining failures were caught before they stopped a compressor.
Project Photos
Click any photo to enlarge it.
More Condo HVAC Projects
Yorkville Yorkville 42-Unit Tower
Annual Fan Coil Service Program
- Scope
- 42 coil descales + 4 pumps + 11 valves
- On site
- 3 service nights across 2 weeks
- Crew
- Marcus Chen (Ops Mgr) + 4 technicians
- Equipment
- McQuay vertical fan coils, 2001 vintage
- Neighbourhood
- Yorkville
Mimico Mimico 180-Unit Lakefront
Building-Wide Fan Coil Replacement
- Scope
- Rolling fan coil replacement
- On site
- 14-week rolling install
- Crew
- Elena Vargas (Ops Mgr) + 2 crews
- Equipment
- Replacement vertical fan coils with ECM motors
- Neighbourhood
- Mimico
Agincourt Agincourt Low-Rise Magic-Pak
Two-Floor Magic-Pak Replacement
- Scope
- 16 units to MGE series + louvers
- On site
- 8 working days
- Crew
- David Okonkwo (Ops Mgr) + 3 technicians
- Equipment
- Magic-Pak MGE series
- Neighbourhood
- Agincourt
Planning Work Like This in Your Building?
Start with a free walk-through and readings in sample suites. Your board gets a written scope, per-unit pricing and a schedule before anyone commits.
- Written scope before work
- TSSA + Enbridge Red Tag + ESA + WSIB
- Written workmanship warranty