# Mimico 180-Unit Lakefront Building-Wide Fan Coil Replacement

A documented project record from 

Condo HVAC Repair Toronto

[/ →](/)

. A lakefront Mimico building with fan coils well past 25 years had corroded drain pans, failing PSC motors and a reserve fund study that flagged HVAC as the next major capital item. The board approved a phased replacement that kept every resident in their suite.

By The Condo HVAC Repair Toronto Crew

$186,000 CAD 14-week rolling install 180 suites

![Crew setting a new vertical fan coil cabinet in a Mimico lakefront condo suite](/images/misc/hvac-crew-of-three-setting-a-new-vertical-fan-coil.webp)

Project Record

## Project Attributes

Scope

Building-wide rolling fan coil replacement

Price

$186,000 CAD

Payment

Progress billing by floor, holdback at commissioning

Lead time

8 weeks equipment procurement

On site

14-week rolling install

Client

Condo corporation board

Crew

Elena Vargas (Ops Mgr) + 2 crews

Equipment

Replacement vertical fan coils with ECM motors

Neighbourhood

Mimico

Building

180 suites, 1990s construction

## The Challenge

Lake-effect humidity had corroded galvanized pans and cabinet bases faster than inland buildings. Leak calls were up every year and two insurance claims in one season pushed the board to act.

The corporation needed the program to fit a reserve fund cash flow, so the work had to be billed by floor with a holdback until commissioning.

### Results

-   Building-wide replacement completed inside the 14-week window.
-   Progress billing by floor matched the reserve fund draw schedule.
-   Leak calls from the original fan coils dropped to zero after completion.
-   Commissioning logbook filed for the next reserve fund study update.

## How We Ran It

1.  1
    
    ### Spec and procurement
    
    Elena Vargas wrote a like-for-like dimensional spec so new cabinets fit the existing closets and riser connections, with ECM motors for quieter operation. Equipment lead time was 8 weeks.
    
2.  2
    
    ### Floor-by-floor schedule
    
    The board approved a 14-week rolling calendar posted in every elevator. Each suite was out of service for one working day at most.
    
3.  3
    
    ### Two crews, one sequence
    
    Crew A drained, removed and disposed of old units. Crew B set, piped, wired and started the new coil the same day. Floor protection and dust control were standard in every suite.
    
4.  4
    
    ### Commissioning logbook
    
    Each unit was started, checked for leaks and recorded with supply temperature and motor settings. The board received the logbook and warranty certificates at close-out.
    

On Site

## Project Photos

Click any photo to enlarge it.

 

Related

## More Condo HVAC Projects

Condo HVAC Replacement service

[/condo-hvac-replacement/ →](/condo-hvac-replacement/)

 

Condo HVAC in Etobicoke

[/locations/etobicoke/ →](/locations/etobicoke/)

 

![Two technicians descaling an open McQuay vertical fan coil in a Yorkville condo suite](/images/misc/two-hvac-technicians-in-navy-workwear-descaling-an.webp) Yorkville

### Yorkville 42-Unit Tower

Annual Fan Coil Service Program

$38,500 CAD

Scope

42 coil descales + 4 pumps + 11 valves

On site

3 service nights across 2 weeks

Crew

Marcus Chen (Ops Mgr) + 4 technicians

Equipment

McQuay vertical fan coils, 2001 vintage

Neighbourhood

Yorkville

View full project record

[Yorkville 42-Unit Tower →](/projects/yorkville-42-unit-annual-service/)

 

![Technicians sliding a Trane water-source heat pump chassis out of a condo closet in Markham](/images/misc/two-technicians-sliding-a-trane-water-source-heat-.webp) Downtown Markham

### Downtown Markham 24-Unit Mid-Rise

Water-Source Heat Pump Repair

$14,200 CAD

Scope

Reversing valves + contactors

On site

6 days over one season

Crew

James Kowalski (Ops Mgr) + 2 technicians

Equipment

Trane Axiom water-loop heat pumps

Neighbourhood

Downtown Markham

View full project record

[Downtown Markham 24-Unit Mid-Rise →](/projects/downtown-markham-24-unit-heat-pump-repair/)

 

![Technicians lifting a new Magic-Pak MGE unit into a closet in an Agincourt low-rise](/images/misc/three-technicians-lifting-a-new-magic-pak-mge-thro.webp) Agincourt

### Agincourt Low-Rise Magic-Pak

Two-Floor Magic-Pak Replacement

$92,800 CAD

Scope

16 units to MGE series + louvers

On site

8 working days

Crew

David Okonkwo (Ops Mgr) + 3 technicians

Equipment

Magic-Pak MGE series

Neighbourhood

Agincourt

View full project record

[Agincourt Low-Rise Magic-Pak →](/projects/agincourt-magic-pak-floor-replacement/)

![](/images/misc/operations-manager-presenting-a-written-hvac-scope.webp)

24-Hour Condo Emergency Dispatch

## Planning Work Like This in Your Building?

Start with a free walk-through and readings in sample suites. Your board gets a written scope, per-unit pricing and a schedule before anyone commits.

Book a $185 Diagnostic

[/contact/ →](/contact/)

 

Call (647) 294-5454

[tel:+16472945454 →](tel:+16472945454)

-   \* Written scope before work
-   \* TSSA + Enbridge Red Tag + ESA + WSIB
-   \* Written workmanship warranty